Logo
Astral Resources NL

Stockhead Investor: Astral Resources’ flow of high-grade gold builds confidence in Theia open pit

Infill drilling at Astral Resources’ Mandilla project continues to deliver high-grade gold assays that demonstrate the potential of the Stage 1 open pit to deliver significant gold.

The latest results cover 65 reverse circulation holes for 6876m in the closely spaced 12.5m x 12.5m drilling program.

Astral Resources reported standout intercepts of 15m at 7.54g/t gold from 95m including 1m at 84.4g/t from 108m in hole AMRC501.

Other notable intersections from the latest batch of assays are: Preview (opens in a new tab)

4m at 18.4g/t gold from 110m including 1m at 66.9g/t from 110m (AMRC507)

4m at 11.3g/t gold from 112m including 1m at 20.7g/t from 114m (AMRC459); and

1m at 9g/t gold from 93m and 17m at 2.59g/t from 106m (AMRC453).

Results of 13m at 3.22g/t gold from 100m and 11m at 3.35g/t from 65m add to the mix of broad mineralised intervals and discrete high-grade zones.

Astral reported a weighted average grade of 1.51g/t gold across the Stage 1 infill intercepts in the latest batch, compared with the proposed pit’s 1.1g/t production target grade.

Drilling to firm up the first pit

AAR has completed 303 holes for 30,973m, with another 129 holes for about 12,616m planned.

The closely spaced drilling is designed to support upgrading the entire Stage 1 pit resource to the higher-confidence measured category and lift certainty in material scheduled for the first two years of mining.

“This ongoing program of in-fill drilling will support the conversion of the entire Stage 1 pit into the higher-confidence Measured Resource category,” AAR managing director Marc Ducler said.

Under the Mandilla pre-feasibility study, the proposed Stage 1 pit contains 4.2Mt at 1.1g/t gold for 146,000 ounces over the first 21 months of the project.

Theia’s 1.4Moz resource contributes about 75% of the PFS production target, with 1.1Moz of production attributed to the deposit.

Gold and exploration in the Goldfields

Spot gold rebounded to US$4,020.60/oz on October 26 after falling to US$3,975 on October 23, its lowest level since July 20, Reuters reported.

At Theia, two rigs are operating, with 19 out of 21 planned diamond holes completed in the separate Theia Deeps program, with assays pending for two holes covering 1,422m.

Further infill and deep drilling will feed into development work at Mandilla, with the definitive feasibility study targeted for the March quarter of 2027.

Share your feedback

Discover