Proactive Investor: Astral advances Mandilla DFS as drilling builds across gold project portfolio
Astral Resources NL (ASX:AAR) advanced drilling and study work at its flagship Mandilla Gold Project during the March 2026 quarter, with activity spanning grade control, resource growth, geotechnical work and deeper drilling.
The company completed 102 reverse circulation holes for 13,069 metres, targeting Theia Stage 2 grade control, extension drilling at the Eos deposit, testing the gap between the Theia and Iris deposits, pre-collars for the Theia deeps diamond drilling program and sterilisation drilling.
Astral also completed 12 geotechnical diamond holes for 868 metres across the Eos and Hestia deposits and the proposed processing plant location.
A six-hole diamond drilling program for about 3,000 metres was also launched at Theia to test for depth extensions below the current Stage 5 open pit design. During the quarter, assay results were reported for 7 diamond holes covering 2,417 metres.
0
likes
•
0
questions
•
0
company answers
Ask a question
Your question will be sent privately to Astral Resources NL. The company may choose to make this question public.
Investor Q&As
Start the conversation
Ask Astral Resources NL a question about this update.