Melbourne Mining Club Cutting Edge Series Presentation
Released
Released
Announcement PDF
Melbourne Mining Club
Cutting Edge Series
July 2026
Mandilla Gold Project:
Building a West Australian
long-life, high-margin gold project
Marc Ducler
Managing Director
astralresources.com.au ASX:AAR | 2
Important Information and Disclaimer
The following notices and disclaimers apply to this presentation, and you are therefore advised to read this carefully before reading or making any other use of this presentation or any information contained in this presentation. This presentation has been
authorised for release to the Australian Securities Exchange (“ASX”) by the Board of directors of Astral (“Board”).
This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in
a violation of securities laws in such jurisdiction.
Summary information
This presentation contains general and background information about Astral's activities current at the date of this presentation(unless otherwise indicated). The information in this presentation is in summary form and does not purport to be complete nor does it
contain all the information in relation to Astral. It should be read in conjunction with Astral's other periodic and continuous disclosure announcements lodged with the ASX at www.asx.com.au. Recipients should conduct their own investigations and perform their
own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
Not an Offer
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.
Financial information
All financial information in this presentation is in Australian dollars unless otherwise stated.
Non-IFRS financial measures
This presentation contains certain financial measures (such as NPV and IRR) that are not recognised under International Financial Reporting Standards (“IFRS”). Although the Company believes these measures provide useful information about the Company's
financial forecasts, they should not be considered in isolation or as a substitute for measures of performance or cash flow prepared in accordance with IFRS. As these measures are not based on IFRS, they do not have standardised definitions and the way the
Company calculates these measures may not be comparable to similarly titled measures used by other companies. Consequently, undue reliance should not be placed on these measures.
Not investment advice
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not
intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include, amongst others, the risk of
adverse or unanticipated market, financial or political developments.
No Liability
To the maximum extent permitted by law, Astral and its related bodies corporate and affiliates, and the respective officers, directors, partners, employees, agents and advisers of Astral and its related bodies corporate and affiliates: (i) disclaim all responsibility
and liability (including, without limitation, any liability arising from fault, negligence or negligent misstatement) for any loss, expense, damage or cost arising from this presentation or reliance on anything contained in or omitted from it or otherwise arising in
connection with this presentation; (ii) disclaim any obligations or undertaking to release any updates or revision to the information in this presentation to reflect any change in expectations or assumption; and (iii) do not make any representation or warranty,
express or implied, as to the accuracy, reliability, completeness of the information in this presentation or that this presentation contains all material information about Astral or that a prospective investor or purchaser may require in evaluating a possible
investment in Astral or acquisition of shares in Astral, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any forward-looking statement.
No party other than Astral has authorised or caused the issue of this presentation, or takes any responsibility for, or makes any statements, representations or undertakings in this presentation.
Forward-Looking Statements
This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”,
“potential”, “could”, “likely”, “nominal”, “conceptual”, “propose”, “will”, “forecast”, “estimate”, and similar expressions. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Astral.
Neither the Company, its officers nor any other person gives any warranty, representation, assurance or guarantee that the events or other matters expressed or implied in this presentation (including the forward-looking statements) will actually occur. Actual
values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward-looking statements.
Any forward-looking statement in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Astral does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this presentation or any changes in events, conditions or circumstances on which any such forward-looking statement is based.
astralresources.com.au ASX:AAR | 3
Important Information and Disclaimer
Production Target
The total Life of Mine Production Target (and forecast financial information derived from the Production Target) referred to in this presentation is underpinned by approximately 75% by Probable Ore Resources, approximately 5% by Indicated Mineral
Resources which were not converted to Ore Reserves and the remaining approximately 20% by Inferred Mineral Resources.
There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast
financial information) will be realised.
The proportion of Inferred Mineral Resources underpinning the Life of Mine Production Target is not the determining factor in project viability. The Inferred Mineral Resources do not feature as a significant proportion early in the mine plan and the forecast
payback period for the Mandilla Gold Project is less than one year.
Competent Person Statements
Mandilla
The information in this presentation that relates to the Ore Reserves for the Mandilla Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 25 June 2025 titled “Mandilla Project Pre-Feasibility Study –
Maiden Ore Reserve". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 25 June 2025 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from
previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
The information in this presentation that relates to the Mineral Resources for the Mandilla Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 21 April 2026 titled "Mineral Resource Increased to 2.07
Million Ounces". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 3 April 2025 and all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from previous market
announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Feysville
The information in this presentation that relates to the Ore Reserves for the Feysville Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 25 June 2025 titled “Mandilla Project Pre-Feasibility Study –
Maiden Ore Reserve". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 25 June 2025 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from
previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
The information in this announcement that relates to the Mineral Resources for the Feysville Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 1 November 2024 titled "Astral's Group Gold Mineral
Resource Increases to 1.46Moz with Updated Feysville MRE". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 1 November 2024 and all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented
have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Spargoville
The information in this announcement that relates to the Mineral Resources for the Spargoville Project reported in this announcement were announced in the Company’s ASX announcement dated 7 May 2025 titled "Astral's Group Gold Mineral Resource
Increases to 1.76Moz with the inclusion of Spargoville Gold Project". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 7 May 2025 and all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented
have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Pre-Feasibility Study
The information in this presentation that relates to the production target for the Mandilla Gold Project was reported by Astral in accordance with ASX Listing Rules and the JORC Code (2012 edition) in the announcement “Mandilla Project Pre-Feasibility
Study – Maiden Ore Reserve" released to the ASX on 25 June 2025. A copy of that announcement is available at www.asx.com.au. Astral confirms it is not aware of any new information or data that materially affects the information included in that market
announcement and that all material assumptions and technical parameters underpinning the production target, and the related forecast financial information derived from the production target in that market announcement continue to apply and have not
materially changed. Astral confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from that market announcement.
astralresources.com.au ASX:AAR | 4
Important Information and Disclaimer
Previously Reported Results
Exploration Results
The information in this presentation that relates to Exploration Results is extracted from the ASX Announcements (Original Announcements), which have been previously announced on the Company’s ASX Announcements Platform and the Company’s
website at www.astralresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Original Announcements and that all material assumptions and technical parameters
underpinning the estimates in the Original Announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified
from the original announcement.
ASX:AAR |
astralresources.com.au 5
Astral Resources Investment Highlights
Tier-1 location in the
WA Goldfields
2.1Moz Mineral
Resource and
growing
+95kozpa
production profile
(first 12 years)
Robust
economics and
rapid payback
Strong balance sheet
(~$73m cash)
Clear pathway to
DFS
Multiple near-
term catalysts
Developing a new circa 100kozpa long-life gold project near Kalgoorlie
astralresources.com.au ASX:AAR | 6
A significant long-life, high-margin
gold development in Australia
Why Mandilla Matters…
Large, coherent gold system in
established mining jurisdiction
Conventional open pit mining and
processing with strong metallurgy
Significant exploration upside across
tenure
Tier-1 location with world-class
infrastructure, services and low
sovereign risk
astralresources.com.au ASX:AAR | 7
Corporate Overview
Options / Rights
20.3M/20.2M
(Ave exercise price 11.4c)
Cash on Hand
A$73.0M
(Mar Qtr 2026)
Significant Shareholders
Research Coverage
Institutional 27.4%
Non-Institutional 68.9%
Board & Management 3.7%
Shares On Issue
1,801M
Market Capitalisation
A$207.1M
Enterprise Value
A$134.1M
Company Snapshot
Share Price
A$0.12
Share Price Performance
astralresources.com.au ASX:AAR | 8
8
Corporate & Technical Capability
Mark Connelly
Non-Executive Chairman
Justin Osborne
Non-Executive Director
Peter Stern
Non-Executive Director
David Varcoe
Non-Executive Director
Marc Ducler
Managing Director
Brendon Morton
Chief Financial Officer &
Company Secretary
Jed Whitford
COO
Marc Ducler has over 20 years’
experience in the mining industry.
He was previously the Managing
Director of Egan Street Resources
(ASX:EGA) until its successful
takeover by Silver Lake Resources
(ASX:SLR).
Brendon has over 20 years
experience including a significant
amount of experience in the global
resources sector, including Australia,
Africa and Asia. Brendon has held a
number of executive financial and
company secretarial roles with both
ASX listed and unlisted companies
operating in the resources sector.
Jed has over 25 years experience
in the mining industry. In his most
recent assignment Jed held a
senior role with Glencore Nickel's
global management team, he has
previously held roles with
EganStreet Resources, Xstrata,
Minara Resources, Golder
Associates and Gold Fields
amongst others.
Management Team
Board of Directors
Mark is a Corporate Executive with
a track record for deal making and
was principally responsible for the
merger of Papillon Resources and
B2 Gold Corp in October 2014, as
well for Adamus Resources Limited
and Endeavour Mining Merger in
September 2011.
Mr Osborne has over 30 years
experience as an exploration
geologist. He was previously an
Executive Director at Gold Road
Resources (ASX: GOR) and was
pivotal to the resource development
of the world class Gruyere Gold
Deposit (6.6Moz Au).
Is a graduate of Monash University
with a Bachelor of Science (geology
major). Mr Stern’s career has been
in corporate advisory, spending six
years with Macquarie Bank and
three years with both UBS and
Deutsche Bank.
David Varcoe is a mining
engineer has more than 30 years
experience in the industry. He
has extensive operational and
managerial experience across a
number of commodities including
gold, iron ore, copper, diamonds,
coal, uranium and rare earths.
Julie Reid
Geology Manager
Julie has 36 years experience
working throughout Australia,
Vietnam and Indonesia covering
a range of commodities within
diversified geological terrain.
Julie holds a Batchelor of
Applied Science from Curtin
University of Technology.
ASX:AAR |
astralresources.com.au 9
Mandilla PFS Highlights – Compelling Project Economics
+95kozpa
production
profile
1.1g/t average for
12yrs
Further 6.5 years of
LG stockpiles at
42kozpa
Long
mine life
13.2 yrs mining,
18.5 yrs
processing
Profitable,
high-margin
(at A$4,250/oz Au)
AISC
A$ 2,085/oz
over LOM
Funding
quantum
in reach
2.75Mtpa plant
and NPI
A$180.4M
Pre-production
A$46.7M
Robust
Financials
(post Capex/Pre-tax
at A$4,250/oz Au)
NPV8 $1.4B
FCF $2.8B
Payback
12 months
Simple and
conventional
Conventional D&B, load
& haul open pit
Strip ratio of 5.5x*
Simple processing
Excellent metallurgy
95.5% recovery
* Theia only strip ratio. Strip ratio over the LoM is 6.4x when including the remaining Mandilla and Feysville deposits
2 - Refer to Appendix 1 for detailed PFS financial information and to ASX Announcement dated 25 June 2025.
Project
Economics at
Spot Au Price
($6,000)
$2.7B2
NPV8
(pre-tax)
$5.2B
FCF
+95kozpa
Production profile
6 months
Payback
A$ 2,140/oz
AISC over LOM
astralresources.com.au ASX:AAR | 10
• GR Engineering engaged to complete DFS and
deliver an agreed Target Cost model
• Independent Technical Expert report underway
(initial scope limited to the April 2026 MRE)
• Capital and operating costs received and under
internal review
• Detailed mine designs, schedules and mine
costing underway
• Site layouts to be finalised in the September
Quarter with NVCP, MDCP and Works Approval
submitted immediately thereafter
Mandilla Definitive Feasibility Study
astralresources.com.au ASX:AAR | 11
Development Schedule* – Clear Pathway to Production
Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026 Q4 2026 Q1 2027 Q2 2027
In Progress
Stage 1 Thea in-fill
Think Big Mining
DFS Delivery
Debt process underway
Approvals
Final Investment Decision
* DFS timing impacted by finalisation of site layouts as a result of the Mineral Rights Agreement and the NTA (Heritage surveys)
astralresources.com.au ASX:AAR | 12
• Diamond drilling program has been
underway since March 2026
• 9 holes for 5,650 metres completed
to date
• Original program 6-hole (3,000m)
expanded to 12-hole (7,500)
• All completed holes have logged
significant quartz-sulphide vein
percentages and visible gold* –
indicative of a potential significant
extension to the Theia mineralisation
at depth
• Assay results reported for 5 of the 9
completed holes
Theia – The key deposit –remains open at depth
* Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations
or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations. See Appendix 3 for logging of holes for which chemical assay results have not yet been reported (expected during Sept-26 qtr).
ASX:AAR |
astralresources.com.au 13
• AMRCD263 returned significant gold mineralisation
600m downhole
• AMRCD259 returned significant gold mineralisation
735m downhole
• Drilling has demonstrated significant gold
mineralisation and a potential extension of Theia up to
350 metres below the base of April 2026 MRE shell
Theia Deeps Drilling Progress
ASX:AAR |
astralresources.com.au 14
• AMRCD261 returned significant gold
mineralisation 54m at 2.38g/t Au starting
below the base of the proposed pit
• AMRCD262 (assays pending – expected
during Sept-26 quarter) has logged
significant quartz-sulphide veining and visible
gold* from the base of the pit extending to
230m below the pit shell
• This section is located further 260m south of
the previous section and highlights the
potential upside with no deep drilling
completed here previously
Theia Deeps Drilling Progress
(continued)
* Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations
or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations. See Appendix 3 for logging of holes for which chemical assay results have not yet been reported (expected during Sept-26 qtr).
ASX:AAR |
astralresources.com.au
• 99 holes (11,121m) in-fill
completed at Stage 1 (average
1.93g/t Au)
• 43 holes (4,324m) in-fill
completed at Stage 2 (average
1.22g/t Au)
• 431 holes (44,400m) in-fill in
progress at Stage 1 (average
1.41g/t Au to date)
• On completion, entirety of Stage 1
will be in the higher confidence
Measured Resource category
Theia de-risking – drilling to achieve the higher confidence Measured
Resource category
ASX:AAR |
astralresources.com.au 16
Feysville – Satellite Opportunity
• Feysville Project located 14km
south of Kalgoorlie – emerging high-
grade satellite operation
• Feeding into central production and
processing hub located at Mandilla
• Comprises multiple deposits – Think
Big, Kamperman, Rogan Josh
• Kamperman emerging as an
exciting high-grade discovery
• Think Big – early cash-flow
opportunity through mining JV
ASX:AAR |
astralresources.com.au 17
Modest 17-hole (2,954m) recently completed
Exploration Growth
Best results included:
• 14m at 6.79g/t Au from 192m
• 13m at 6.60g/t Au from 44m
• 21m at 3.11g/t Au from 115m
• 15m at 3.70g/t Au from 123m
• 23m at 2.75g/t Au from 180m
• 14m at 2.66g/t Au from 179m
• 25m at 1.68g/t Au from 50m
Broad zones of new mineralisation identified
at depth – well outside the current MRE
Kamperman 83,700oz and growing
Testing for Kamperman style mineralisation to
the immediate west and north to commence
once heritage surveys are finalised
Refer to ASX announcement dated 21-Jan-26.
astralresources.com.au ASX:AAR | 18
• LOI executed to mine ~ 32,000oz from Think
Big as an early revenue opportunity to fund
development of the Mandilla Gold Project
• Native Title Agreement executed with
Marlinyu Ghoorlie
• Mining Tenement M 26/846 recently granted
• NVCP and MDCP for Think Big submitted and
currently under assessment
• 6,000m of RC drilling completed to in-fill Think
Big ahead of mining (assays pending)
Think Big has the potential to contribute
significant free cash-flow to support the Mandilla
Gold Project funding requirements
Feysville – Think Big Monetisation
astralresources.com.au ASX:AAR | 19
Spargoville – Significant Exploration Upside
~14km of highly prospective strike between the
Wattle Dam and Eagle Complex with very little
deep drilling outside of known Resource areas
• Two high-priority areas identified for immediate
follow-up following a recent targeting exercise
• Both areas are essentially untested below 100m
drill depth despite favorable geological conditions,
gold-in-soil anomalism and proximity to known
deposits
• Complex NNW fault system hosting the Wattle
Dam deposit (262koz) and extending north and
south along strike from Eagle’s Nest (18koz)
• Highly prospective trap for gold mineralisation
Wattle Dam
Eagle Complex
Holes > 100m
depth assayed
for gold across
Spargoville
tenements
astralresources.com.au ASX:AAR | 20
Key Catalysts
Theia Deeps diamond drilling
Mandilla, Kamperman and Spargoville
MRE updates
DFS completion
Think Big mine production
Kamperman and Spargoville exploration
ASX:AAR |
astralresources.com.au ASX:AAR |
astralresources.com.au 21
Investment Summary
Emerging WA gold
developer
Robust long-life
project economics
Significant resource
growth potential
Strong balance
sheet
Clear pathway
to DFS
ASX:AAR |
astralresources.com.au 22
(1,200)
(900)
(600)
(300)
-
300
600
900
1,200
1,500
1,800
2,100
2,400
(300)
(200)
(100)
-
100
200
300
400
500
600
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Cum Cash Flow(RHS) Net Revenue Opex
Corporate, Exploration, Feasibility Change in Working Capital Capex
Sustaining Capex Annual Cash Flow
Key Financial Assumptions
Gold Price Assumed A$/oz 4,250
Discount Rate % 8
Foreign Exchange AUD:USD 0.65
Key Project Metrics
Payable Metal Koz 1,414
Gold Revenue A$M 6,011
Mining Costs – Total A$M 1,594
Mining Costs – Pre-Production (capitalised) A$M -40
Mining Costs A$M 1,553
Processing (including Maintenance, Transport, Insurance & Refining) A$M 963
General and Administrative Costs A$M 166
Royalties A$M 187
Project EBITDA A$M 3,142
Depreciation and Amortisation A$M 307
Net Profit Before Tax A$M 2,835
Capital
Pre-Production Capital Expenditure (incl. contingency) A$M 180
Pre-Production Costs - Mining/General & Administrative A$M 47
Sustaining Capital A$M 80
LOM Capital A$M 307
Project Returns
FCFF (Pre-tax) A$M 2,835
FCFF (Post-tax) A$M 2,012
Pre Tax NPV @ FID (8.0%) AUD M 1,400
Pre Tax IRR (at FID) % 101%
Pre Tax payback - From first Au production Years 0.92
Post Tax NPV @ FID (8.0%) AUD M 1,001
Post Tax IRR (at FID) % 86%
Post Tax payback - From first Au production Years 1.00
Equity NPV @ FID (8.0%) AUD M 1,001
Post Tax IRR (at FID) % 86%
Capital Intensity (Steady State) AUD/oz p.a. 2,381
Pre-Tax NPV/Pre-Production Capital x 6.16
Post-Tax NPV/Pre-Production Capital x 4.41
Appendix 1 - PFS Financials
Stage 1 Cash Flow
Operating Costs1 $ million $/t Milled $/oz
Mining2 $1,553 $30.81 $1,098
Processing (incl. Maintenance, Transport, Insurance & Refining) $963 $18.95 $681
General & Administrative (Site) $166 $3.28 $118
C1 Cash Cost3 $2,682 $52.80 $1,897
Royalties $187 $3.69 $132
Sustaining Capital $80 $1.57 $56
All-in Sustaining Cost (AISC)4 $2,949 $58.05 $2,085
LoM of Mining Costs:
$4.25 per tonne
$12.48 per BCM
ASX:AAR |
astralresources.com.au 23
Appendix 2 – Mineral Resources & Ore Reserves
Project
Probable Total Ore Reserve
Tonnes Grade Metal Tonnes Grade Metal
(Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au)
Mandilla 34.3 0.9 1,000,000 34.3 0.9 1,000,000
Feysville 2.3 1.2 88,000 2.3 1.2 88,000
Total 36.6 0.9 1,082,000 36.6 0.9 1,082,000
Ore Reserves are a subset of Mineral Resources.
Ore Reserves are estimated using a gold price of AUD $3,000 per ounce.
The preceding statement of Ore Reserves conforms to the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor
discrepancies may occur due to rounding to appropriate significant figures.
The Ore Reserves for Mandilla are reported at a cut-off grade of 0.30 g/t Au lower cut-off and Feysville are reported at a
cut-off grade of 0.40 g/t Au lower cut-off.
Group Ore Reserve Estimate
Group Mineral Resource Estimate
Project
Measured Indicated Inferred Total Mineral Resource
Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal
(Mt)
(Au
g/t)
(oz Au) (Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au)
Mandilla 1.3 1.3 57,000 32.6 1.0 1,092,000 19.6 0.9 588,000 53.5 1.0 1,736,000
Feysville - - - 3.5 1.3 144,000 1.5 1.1 53,000 5.0 1.2 196,000
Spargoville - - - 1.9 1.3 81,000 1.1 1.6 58,000 3.0 1.4 139,000
Total 1.3 1.3 57,000 38.1 1.1 1,317,000 22.2 1.2 698,000 61.6 1.0 2,072,000
The preceding statement of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate
significant figures
The Mineral Resources are reported at 0.40g/t Au lower cut-off for Mandilla and 0.39 g/t Au lower cut-off for Spargoville and Feysville, while constrained
within pit shells derived using a gold price of AUD$4,500 per ounce for Mandilla, AUD$3,500 for Spargoville and AUD$2,500 per ounce for Feysville.
ASX:AAR |
astralresources.com.au 24
Appendix 3 – Logging Table
Py = pyrite, Po = pyrrhotite, Gl = galena, Au = gold, Cpy = Chalcopyrite
All occurrences of visible gold are estimated to be below 0.01% and all logged occurrences of sulphide mineralisation individually and in
combination are estimated to be below 1%.
Hole ID
Downhole
depth (m)
Average
quartz
percentage
Logged
mineralisation
Hole ID
Downhole
depth (m)
Average
quartz
percentage
Logged
mineralisation
Hole ID
Downhole
depth (m)
Average
quartz
percentage
Logged
mineralisation
Hole ID
Downhole
depth (m)
Average
quartz
percentage
Logged
mineralisation
Hole ID
Downhole
depth (m)
Average
quartz
percentage
Logged
mineralisation
AMRCD262 090-100 4.6 Py AMRCD262 410-420 3.6 Py AMRCD376 210-220 1.5 Py AMRCD376 530-540 1.4 Py Au AMRCD378 390-400 2.3 Py Po
AMRCD262 100-110 4.1 Py AMRCD262 420-430 1.4 Py AMRCD376 220-230 3.4 Py Au AMRCD376 540-550 4.2 Py AMRCD378 400-410 4.2 Py Po
AMRCD262 110-120 1.2 Py AMRCD262 430-440 3.1 Py Cpy Au AMRCD376 230-240 2.3 Py AMRCD376 550-560 6.4 Py Gl AMRCD378 410-420 4.8 Py Po Au
AMRCD262 120-130 2.2 Py AMRCD262 440-450 2.4 Py Po Gl Au AMRCD376 240-250 3.2 Py Au AMRCD376 560-570 0.8 Py Au AMRCD378 420-430 1.6 Py Po
AMRCD262
Share your feedback