Beaver Creek Precious Metals Summit Presentation
Released
Released
Announcement PDF
Advancing Mandilla
towards a multidecade 100kozpa
gold mining
development
Precious Metal Summit | Beaver Creek
Marc Ducler
Managing Director
astralresources.com.au
Important Information and Disclaimer
The following notices and disclaimers apply to this presentation, and you are therefore advised to read this carefully before reading or making any other use of this presentation or any information contained in this presentation. This presentation has been
authorised for release to the Australian Securities Exchange (“ASX”) by the Board of directors of Astral (“Board”).
This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in
a violation of securities laws in such jurisdiction.
Summary information
This presentation contains general and background information about Astral's activities current at the date of this presentation(unless otherwise indicated). The information in this presentation is in summary form and does not purport to be complete nor does it
contain all the information in relation to Astral. It should be read in conjunction with Astral's other periodic and continuous disclosure announcements lodged with the ASX at www.asx.com.au. Recipients should conduct their own investigations and perform their
own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
Not an Offer
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.
Financial information
All financial information in this presentation is in Australian dollars unless otherwise stated.
Non-IFRS financial measures
This presentation contains certain financial measures (such as NPV and IRR) that are not recognised under International Financial Reporting Standards (“IFRS”). Although the Company believes these measures provide useful information about the Company's
financial forecasts, they should not be considered in isolation or as a substitute for measures of performance or cash flow prepared in accordance with IFRS. As these measures are not based on IFRS, they do not have standardised definitions and the way the
Company calculates these measures may not be comparable to similarly titled measures used by other companies. Consequently, undue reliance should not be placed on these measures.
Not investment advice
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not
intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include, amongst others, the risk of
adverse or unanticipated market, financial or political developments.
No Liability
To the maximum extent permitted by law, Astral and its related bodies corporate and affiliates, and the respective officers, directors, partners, employees, agents and advisers of Astral and its related bodies corporate and affiliates: (i) disclaim all responsibility
and liability (including, without limitation, any liability arising from fault, negligence or negligent misstatement) for any loss, expense, damage or cost arising from this presentation or reliance on anything contained in or omitted from it or otherwise arising in
connection with this presentation; (ii) disclaim any obligations or undertaking to release any updates or revision to the information in this presentation to reflect any change in expectations or assumption; and (iii) do not make any representation or warranty,
express or implied, as to the accuracy, reliability, completeness of the information in this presentation or that this presentation contains all material information about Astral or that a prospective investor or purchaser may require in evaluating a possible
investment in Astral or acquisition of shares in Astral, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any forward-looking statement.
No party other than Astral has authorised or caused the issue of this presentation, or takes any responsibility for, or makes any statements, representations or undertakings in this presentation.
Forward-Looking Statements
This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”,
“potential”, “could”, “likely”, “nominal”, “conceptual”, “propose”, “will”, “forecast”, “estimate”, and similar expressions. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Astral.
Neither the Company, its officers nor any other person gives any warranty, representation, assurance or guarantee that the events or other matters expressed or implied in this presentation (including the forward-looking statements) will actually occur. Actual
values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward-looking statements.
Any forward-looking statement in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Astral does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this presentation or any changes in events, conditions or circumstances on which any such forward-looking statement is based.
astralresources.com.au
ASX:AAR | 2
Important Information and Disclaimer
Production Target
The total Life of Mine Production Target (and forecast financial information derived from the Production Target) referred to in this presentation is underpinned by approximately 75% by Probable Ore Resources, approximately 5% by Indicated Mineral
Resources which were not converted to Ore Reserves and the remaining approximately 20% by Inferred Mineral Resources.
There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast
financial information) will be realised.
The proportion of Inferred Mineral Resources underpinning the Life of Mine Production Target is not the determining factor in project viability. The Inferred Mineral Resources do not feature as a significant proportion early in the mine plan and the forecast
payback period for the Mandilla Gold Project is less than one year.
Competent Person Statements
Mandilla
The information in this presentation that relates to the Ore Reserves for the Mandilla Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 25 June 2025 titled “Mandilla Project Pre-Feasibility Study –
Maiden Ore Reserve". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 25 June 2025 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from
previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
The information in this presentation that relates to the Mineral Resources for the Mandilla Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 3 April 2025 titled "Group Mineral Resource Increases to
1.62 million ounces with Indicated Resources at the Mandilla Gold Project Exceeding One Million Ounces". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement
dated 3 April 2025 and all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which
Competent Persons’ findings are presented have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Feysville
The information in this presentation that relates to the Ore Reserves for the Feysville Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 25 June 2025 titled “Mandilla Project Pre-Feasibility Study –
Maiden Ore Reserve". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 25 June 2025 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from
previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
The information in this announcement that relates to the Mineral Resources for the Feysville Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 1 November 2024 titled "Astral's Group Gold Mineral
Resource Increases to 1.46Moz with Updated Feysville MRE". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 1 November 2024 and all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented
have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Spargoville
The information in this announcement that relates to the Mineral Resources for the Spargoville Project reported in this announcement were announced in the Company’s ASX announcement dated 7 May 2025 titled "Astral's Group Gold Mineral Resource
Increases to 1.76Moz with the inclusion of Spargoville Gold Project". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 7 May 2025 and all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented
have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Pre-Feasibility Study
The information in this presentation that relates to the production target for the Mandilla Gold Project was reported by Astral in accordance with ASX Listing Rules and the JORC Code (2012 edition) in the announcement “Mandilla Project Pre-Feasibility
Study – Maiden Ore Reserve" released to the ASX on 25 June 2025. A copy of that announcement is available at www.asx.com.au. Astral confirms it is not aware of any new information or data that materially affects the information included in that market
announcement and that all material assumptions and technical parameters underpinning the production target, and the related forecast financial information derived from the production target in that market announcement continue to apply and have not
materially changed. Astral confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from that market announcement.
astralresources.com.au
ASX:AAR | 3
Important Information and Disclaimer
Previously Reported Results
Exploration Results
The information in this presentation that relates to Exploration Results is extracted from the ASX Announcements (Original Announcements), which have been previously announced on the Company’s ASX Announcements Platform and the Company’s
website at www.astralresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Original Announcements and that all material assumptions and technical parameters
underpinning the estimates in the Original Announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified
from the original announcement.
astralresources.com.au
ASX:AAR | 4
The Astral Investment Fundamentals
An Australian gold developer, focused on the Kalgoorlie
goldfields with an extensive land package in the premier mining
jurisdiction of the Kalgoorlie Goldfields in Western Australia.
Three emerging hubs – centred on the flagship Mandilla Project,
with a 1.8Moz Mineral Resource inventory and growing
Positive Pre-Feasibility Study completed, with outstanding
financial outcomes with a robust 1.1Moz maiden Probable
Reserve
Positive Pre-Feasibility Study completed, with outstanding
financial outcomes
DFS now underway alongside an aggressive exploration,
program targeting both resource definition, resource growth &
new discoveries
astralresources.com.au
Astral is the only ASX aspiring gold developer
with a project of this scale in the
Kalgoorlie/Kambalda region
ASX:AAR | 5
Corporate Overview
Shares On Issue
Significant Shareholders:
1,428M
Market Capitalisation
A$271.3M
(at $0.19 per share)
Options / Rights
68.9M/10.6M
(Ave exercise price 12.1c)
Board of Directors
Management Team
Board & Management
3.5%
Cash on Hand 2
Mark Connelly
Justin Osborne
Marc Ducler
Julie Reid
Braham Entities
6.1%
Peter Stern
David Varcoe
Brendon Morton
Steve Lampron
1832 Asset Management
6.1%
Burke Entities
6.0%
Institutional – Other
17.3%
Top 20 – Other
19.2%
Other
41.8%
A$18.6M
(June 2025)
Gold Spot Price
A$5,500
astralresources.com.au
Non-Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
Research Coverage
Managing Director
Chief Financial Officer &
Company Secretary
Geology Manager
Technical Services
Manager
ASX:AAR | 6
Multi-Decade, De-Risked
Development in a Tier-1 Location
Mandilla PFS delivered a long-life mine development
using conservative cost and revenue assumptions.
At $4,250/oz gold price
95kozpa of gold production1
Pre-tax NPV8 of $1.4B
Pre-tax free cashflow of $2.8B
Payback of ~12 months
At $5,000/oz gold price
Pre-tax NPV8 of $2.0B
Pre-tax free cashflow of $3.9B
Payback of ~ 9 months
Growing resource base of 1.8Moz. Strong
history of cost-effective exploration growth
Significant and highly prospective tenement
package in the heart of the WA Goldfields
astralresources.com.au
1 – Initial 12-year period. Reducing to average of 42kozpa for remaining 6.5-year period.
Refer to Appendix 1 for detailed PFS financial information.
ASX:AAR | 7
Project History
Mining in the Mandilla Palaeochannel
Drilling at Mandilla
astralresources.com.au
ASX:AAR | 8
Location, Location, Location
The Mandilla infrastructure is located less than
500m from the Coolgardie – Esperance Hwy
and Mandilla is less than 25 km from the well
serviced town of Kambalda.
Kambalda East
Airstrip
Kambalda West
Bluebush Village Camp
Potable water and gas pipelines
adjacent to Coolgardie-Esperance Hwy
Mandilla Gold Project
astralresources.com.au
ASX:AAR | 9
PFS Highlights – Significant scale and longer life
+95kozpa
production
profile
Long
mine life
Profitable,
high-margin
Funding
quantum
in reach
1.1g/t average
for 12yrs
Further 6.5
years of LG
stockpiles at
42kozpa
13.2 yrs
mining,
18.5 yrs
processing
AISC
A$ 2,085/oz
over LOM
2.75Mtpa plant
and NPI
A$180.4M
Pre-production
A$46.7M
(at A$4,250/oz Au)
Located in a Tier-1 Jurisdiction
WA’s Kalgoorlie Goldfields
70 km south of Kalgoorlie with access
to excellent infrastructure in Kambalda
less than 25 km from Mandilla
astralresources.com.au
(post Capex/Pre-tax
at A$4,250/oz Au)
NPV8 $1.4B
FCF $2.8B
Payback
12 months
Simple and
conventional
Conventional D&B,
load & haul open pit
Strip ratio of 5.5x*
Simple processing
Excellent metallurgy
95.5% recovery
Target Development Timeline
Submit approvals Dec Qtr 2025
DFS June Qtr 2026, FID July 2026
Construction September Qtr 2026
Commissioning December Qtr 2027
* Theia only strip ratio. Strip ratio over the LoM is 6.4x when including the remaining Mandilla and Feysville deposits
Refer to Appendix 1 for detailed PFS financial information.
Robust
Financials
ASX:AAR | 10
Recent Spargoville transaction
de-risks mine development
The completion of the Maximus transaction de-risks mine
development by allowing the optimal design of the Mandilla
surface infrastructure unconstrained by tenement boundaries.
Compact design provides for lower
costs in construction and
operation
astralresources.com.au
ASX:AAR | 11
Plus, this Spargoville transaction added 139koz of
Resources and future growth opportunities
First RC program by Astral recently
completed on the Spargoville tenure,
76 holes for 11,744 metres drilled
Assays returned for 23 holes / 3,420
metres
Results indicate early potential to
continue to grow Spargoville MRE:
•
•
•
•
astralresources.com.au
11m at 1.2g/t Au from 95m and
26m at 2.0g/t Au from 111m
20m at 1.4g/t Au from 43m and
13m at 1.2g/t Au from 111m
10m at 1.4g/t Au from 54m
10m at 1.4g/t Au from 77m
ASX:AAR | 12
1.8Moz MRE – that converts…
95% of the Mandilla
MRE converted into
the PFS production
target.
2,000,000oz
1,800,000oz
1,600,000oz
1,400,000oz
1,200,000oz
86% of the Feysville
MRE converted into
the PFS production
target (excluding
Think Big fresh).
Mandilla, 1,426,000
1,000,000oz
800,000oz
Mandilla, 1,265,000
Mandilla, 1,265,000
Mandilla, 1,034,000
600,000oz
Mandilla, 665,000
400,000oz
Feysville, 196,000
200,000oz
-
Feysville, 116,000
Feysville, 116,000
Feysville, 116,000
Feysville, 116,000
2020
2021
2022
2023
Spargoville
astralresources.com.au
Refer to Appendix 2 - Mineral Resources & Ore Reserves.
Feysville
Feysville, 196,000
Spargoville, 139,000
2024
2025
Mandilla
ASX:AAR | 13
Mandilla Gold Project and the
Cornerstone Theia Deposit
Strategic land
package in a
premier gold
mining jurisdiction,
70km south of
Kalgoorlie
Total MRE has
grown to 42Mt at
1.1g/t Au for
1.43Moz of
contained gold
Reserve of 1.0Moz
Exceptional PFS
Outcome –
producing 95kozpa
for the first 12.5 yrs
and 1.4Moz over
the 18.5-year LOM
22km to the
+20Moz
St Ives Gold Mine
Theia deposit is the cornerstone
Represents 81% of the Mandilla MRE – 33Mt at 1.1g/t
Au for 1.2Moz of contained gold in one large open pit
Probable Reserve of 28Mt at 0.9g/t Au for 829koz
astralresources.com.au
ASX:AAR | 14
Mandilla’s Theia Deposit
– 1.2Moz in a single
large open pit
•
Diamond drilling in late 2024
at Theia returned:
•
1m at 223.3g/t Au
•
9.55m at 27.6g/t Au
•
2.42m at 169.1g/t Au
•
24.9m at 4.14g/t Au
•
Circa 10,000m of in-fill RC drilling is
currently underway in Stage 1 of
Theia down to ~ 150m depth to test
the MRE response to grade control
drilling – further de-risking the
Mandilla development
•
Approximately 3,000m of diamond
drilling is also planned to test HG
targets within and extensional to
the Theia MRE
astralresources.com.au
2 Gram-metres or GxM is the product of the assayed grade of the reported interval multiplied by the length of the reported interval.
Diamond drilling program
gram-metre2 averages:
•
CY2022 – 97 gram-metres
•
1H CY2023 – 108 gram-metres
•
2H CY2023 – 137 gram-metres
•
2H CY2024 – 401 gram-metres
ASX:AAR |
Latest in-fill results at Theia certainly appear to
support the current MRE and then some…
• 20% of the grade control drilling has returned
assays to date. Best results include:
• 32m at 10.8g/t Au from 50m
• 2m at 95.9g/t Au from 105m
• 1m at 19.8g/t Au from 45m and 34m at 1.6g/t
Au from 62m
• 9m at 5.1g/t Au from 62m
• 1m at 10.5g/t Au from 26m and 40m at 1.1g/t
Au from 73m
• 17m at 2.2g/t Au from 87m
• 16m at 2.3g/t Au from 98m
astralresources.com.au
2 Gram-metres or GxM is the product of the assayed grade of the reported interval multiplied by the length of the reported interval.
ASX:AAR |
Feysville – A significant
Satellite Hub
•
14km south of Kalgoorlie – potential to yield multiple
100koz scale deposits
•
Current MRE: 5Mt at 1.2g/t Au for 196,000oz3 at
Kamperman, Rogan Josh and Think Big
•
Maiden MRE’s announced for Kamperman and Rogan
Josh (November 2024) – A$19/oz discovery cost
•
Maiden Probable Reserve announced June 2025 of
2.3Mt at 1.2g/t Au for 88,000oz
•
Kamperman, Think Big and Rogan Josh production
target is 3.7Mt at 1.1g/t Au for 132,000oz
Feysville contributes ~ $250M free cash flow 4 as a
Satellite Mine feeding the Mandilla Gold Project
astralresources.com.au
3 Feysville JORC 2012 MRE includes; Indicated Mineral Resources of 3.5 Mt at 1.3g/t
Au for 144koz and Inferred Mineral Resources of 1.5Mt at 1.1g/t Au for 53koz
4 Mandilla PFS - AISC ($2,085/oz) and $4,250/oz base case revenue assumption
ASX:AAR | 17
Forward work plans
Year
2025
2026
2027
Quarter
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
End of Quarter
Mar
Jun
Sep
Dec
Mar
Jun
Sep
Dec
Mar
Jun
Sep
Dec
3,300m regional RC drilling at Feysville (completed)
Growth
3,000m infill RC drilling at Iris (completed)
3,300m extensional/sterilisation drilling at Hestia (completed)
10,000m regional RC drilling at Spargoville (completed – assays pending)
10,000m infill RC drilling at Theia Stage 1 (in progress – assays pending)
3,000m diamond drilling targeting HG structures at Theia (scheduled for October)
Award DFS - process and NPI (preferred engineering partner notified – contract to be
executed)
DFS ECI phase
Development
Early works - engineering, detailed design, long lead
Environmental permitting submissions
Environmental approvals
Native Title Agreement
Final Investment Decision (FID)
Construction of process plant, NPI and TSF
Pre-mining, site works, mine production
Commissioning
astralresources.com.au
ASX:AAR | 18
Why invest with Astral?
Strong balance sheet,
funded through to FID,
with a strong register
to fund development
Tier 1 location, in the
heart of Kalgoorlie
Goldfields,
infrastructure rich,
strong community
support
Compelling financial
metrics, simple bulkscale mining and
processing,
conservative revenue
and cost assumptions
Significant tenement
package with
exploration upside at
Mandilla, Spargoville
and Feysville
Experienced board,
and management,
with the right skills
to advance Mandilla
into development
Astral is the only ASX aspiring gold developer with a project of this scale in the Kalgoorlie/Kambalda region
astralresources.com.au
ASX:AAR | 19
Core Value Proposition
Well funded with strong share register
Multi-decade development opportunity
12.5yrs at 95kozpa production rate
1.8Moz Resource base and growing
1.1Moz Probable Reserve
Significant growth potential
Located in the heart of the
Goldfields with a significant
tenement footprint
astralresources.com.au
ASX:AAR | 20
Appendix 1 - PFS Financials
600
1,200
900
Processing (including Maintenance, Transport, Insurance & Refining)
A$M
963
600
General and Administrative Costs
Royalties
Project EBITDA
Depreciation and Amortisation
Net Profit Before Tax
Capital
Pre-Production Capital Expenditure (incl. contingency)
Pre-Production Costs - Mining/General & Administrative
Sustaining Capital
LOM Capital
Project Returns
FCFF (Pre-tax)
FCFF (Post-tax)
Pre Tax NPV @ FID (8.0%)
Pre Tax IRR (at FID)
Pre Tax payback - From first Au production
Post Tax NPV @ FID (8.0%)
Post Tax IRR (at FID)
Post Tax payback - From first Au production
Equity NPV @ FID (8.0%)
Post Tax IRR (at FID)
Capital Intensity (Steady State)
Pre-Tax NPV/Pre-Production Capital
Post-Tax NPV/Pre-Production Capital
A$M
A$M
A$M
A$M
A$M
166
187
3,142
307
2,835
A$M
A$M
A$M
A$M
180
47
80
307
A$M
A$M
AUD M
%
Years
AUD M
2,835
2,012
1,400
101%
0.92
1,001
86%
1.00
1,001
86%
2,381
6.16
4.41
2,400
Stage 1 Cash Flow
500
Key Financial Assumptions
Gold Price Assumed
Discount Rate
Foreign Exchange
Key Project Metrics
Payable Metal
Gold Revenue
Mining Costs – Total
Mining Costs – Pre-Production (capitalised)
Mining Costs
2,100
1,800
400
1,500
300
200
100
300
-
-
(300)
(100)
(600)
(200)
(900)
(300)
0
1
2
3
4
5
6
7
8
9
10
11
Cum Cash Flow(RHS)
Net Revenue
Opex
Corporate, Exploration, Feasibility
Change in Working Capital
Capex
Sustaining Capex
Annual Cash Flow
Operating Costs1
$ million
$/t Milled
$/oz
$1,553
$30.81
$1,098
$963
$166
$18.95
$3.28
$681
$118
C1 Cash Cost3
$2,682
$52.80
$1,897
Royalties
Sustaining Capital
$187
$80
$3.69
$1.57
$132
$56
$2,949
$58.05
$2,085
Mining2
Processing (incl. Maintenance, Transport, Insurance & Refining)
General & Administrative (Site)
All-in Sustaining Cost (AISC)4
astralresources.com.au
12
13
(1,200)
LoM of Mining Costs:
$4.25 per tonne
$12.48 per BCM
A$/oz
%
AUD:USD
4,250
8
0.65
Koz
A$M
A$M
A$M
A$M
1,414
6,011
1,594
-40
1,553
%
Years
AUD M
%
AUD/oz p.a.
x
x
ASX:AAR | 21
Appendix 2 – Mineral Resources & Ore Reserves
Group Mineral Resource Estimate
Group Ore Reserve Estimate
Probable
Project
Total Ore Reserve
Indicated
Tonnes
Grade
Metal
Tonnes
Grade
Metal
(Mt)
(Au g/t)
(oz Au)
(Mt)
(Au g/t)
(oz Au)
Mandilla
34.3
0.9
1,000,000
34.3
0.9
1,000,000
Feysville
2.3
1.2
88,000
2.3
1.2
88,000
Total
36.6
0.9
1,082,000
36.6
0.9
1,082,000
Total Mineral Resource
Tonnes
Grade
Metal
Tonnes
Grade
Metal
Tonnes
Grade
Metal
(Mt)
(Au g/t)
(oz Au)
(Mt)
(Au g/t)
(oz Au)
(Mt)
(Au g/t)
(oz Au)
Mandilla
31
1.1
1,034,000
11
1.1
392,000
42
1.1
1,426,000
Feysville2
4
1.3
144,000
1
1.1
53,000
5
1.2
196,000
Spargoville3
2
1.3
81,000
1
1.6
58,000
3
1.4
139,000
Ore Reserves are a subset of Mineral Resources.
Total
36
1.1
1,259,000
14
1.2
502,000
50
1.1
1,761,000
Ore Reserves are estimated using a gold price of AUD $3,000 per ounce.
The preceding statement of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may
occur due to rounding to appropriate significant figures
The preceding statement of Ore Reserves conforms to the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor
discrepancies may occur due to rounding to appropriate significant figures.
The Ore Reserves for Mandilla are reported at a cut-off grade of 0.30 g/t Au lower cut-off and Feysville are reported at a
cut-off grade of 0.40 g/t Au lower cut-off.
Project
Inferred
1
The Mineral Resources for Mandilla, Feysville and Spargoville are reported at a cut-off grade of 0.39 g/t Au lower cut-off and is
constrained within pit shells derived using a gold price of AUD $3,500 per ounce for Mandilla and Spargoville and AUD$2,500 per
ounce for Feysville.
1.
2.
3.
astralresources.com.au
Mandilla JORC 2012 Mineral Resource Estimate: 31Mt at 1.1g/t Au for 1,034koz Indicated Mineral Resources and 11Mt at 1.1g/t Au for
392koz Inferred mineral Resources (refer to Astral ASX announcement dated 3 April 2025).
Feysville JORC 2012 Mineral Resource Estimate: 4Mt at 1.3g/t Au for 144koz Indicated Mineral Resources and 1Mt at 1.1g/t Au for
53koz Inferred Mineral Resources (refer to Astral ASX announcement dated 1 November 2024).
Spargoville JORC 2012 Mineral Resource Estimate: 2Mt at 1.3g/t Au for 81koz Indicated Mineral Resources and 1Mt at 1.6g/t Au for
58koz Inferred Mineral Resources (refer to Astral ASX announcement dated 7 May 2025).
ASX:AAR | 22