Australian Gold Conference Presentation
Released
Released
Announcement PDF
Advancing the Mandilla
Gold Project into
Development
Marc Ducler
Managing Director
astralresources.com.au ASX:AAR | 2
Important Information and Disclaimer
The following notices and disclaimers apply to this presentation, and you are therefore advised to read this carefully before reading or making any other use of this presentation or any information contained in this presentation. This presentation has been
authorised for release to the Australian Securities Exchange (“ASX”) by the Board of directors of Astral (“Board”).
This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in
a violation of securities laws in such jurisdiction.
Summary information
This presentation contains general and background information about Astral's activities current at the date of this presentation(unless otherwise indicated). The information in this presentation is in summary form and does not purport to be complete nor does it
contain all the information in relation to Astral. It should be read in conjunction with Astral's other periodic and continuous disclosure announcements lodged with the ASX at www.asx.com.au. Recipients should conduct their own investigations and perform their
own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
Not an Offer
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.
Financial information
All financial information in this presentation is in Australian dollars unless otherwise stated.
Non-IFRS financial measures
This presentation contains certain financial measures (such as NPV and IRR) that are not recognised under International Financial Reporting Standards (“IFRS”). Although the Company believes these measures provide useful information about the Company's
financial forecasts, they should not be considered in isolation or as a substitute for measures of performance or cash flow prepared in accordance with IFRS. As these measures are not based on IFRS, they do not have standardised definitions and the way the
Company calculates these measures may not be comparable to similarly titled measures used by other companies. Consequently, undue reliance should not be placed on these measures.
Not investment advice
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not
intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include, amongst others, the risk of
adverse or unanticipated market, financial or political developments.
No Liability
To the maximum extent permitted by law, Astral and its related bodies corporate and affiliates, and the respective officers, directors, partners, employees, agents and advisers of Astral and its related bodies corporate and affiliates: (i) disclaim all responsibility
and liability (including, without limitation, any liability arising from fault, negligence or negligent misstatement) for any loss, expense, damage or cost arising from this presentation or reliance on anything contained in or omitted from it or otherwise arising in
connection with this presentation; (ii) disclaim any obligations or undertaking to release any updates or revision to the information in this presentation to reflect any change in expectations or assumption; and (iii) do not make any representation or warranty,
express or implied, as to the accuracy, reliability, completeness of the information in this presentation or that this presentation contains all material information about Astral or that a prospective investor or purchaser may require in evaluating a possible
investment in Astral or acquisition of shares in Astral, or likelihood of fulfilment of any forward-looking statement or any event or results expressed or implied in any forward-looking statement.
No party other than Astral has authorised or caused the issue of this presentation, or takes any responsibility for, or makes any statements, representations or undertakings in this presentation.
Forward-Looking Statements
This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”,
“potential”, “could”, “likely”, “nominal”, “conceptual”, “propose”, “will”, “forecast”, “estimate”, and similar expressions. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Astral.
Neither the Company, its officers nor any other person gives any warranty, representation, assurance or guarantee that the events or other matters expressed or implied in this presentation (including the forward-looking statements) will actually occur. Actual
values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward-looking statements.
Any forward-looking statement in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Astral does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this presentation or any changes in events, conditions or circumstances on which any such forward-looking statement is based.
astralresources.com.au ASX:AAR | 3
Important Information and Disclaimer
Production Target
The total Life of Mine Production Target (and forecast financial information derived from the Production Target) referred to in this presentation is underpinned by approximately 75% by Probable Ore Resources, approximately 5% by Indicated Mineral
Resources which were not converted to Ore Reserves and the remaining approximately 20% by Inferred Mineral Resources.
There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the Production Target itself (or the forecast
financial information) will be realised.
The proportion of Inferred Mineral Resources underpinning the Life of Mine Production Target is not the determining factor in project viability. The Inferred Mineral Resources do not feature as a significant proportion early in the mine plan and the forecast
payback period for the Mandilla Gold Project is less than one year.
Competent Person Statements
Mandilla
The information in this presentation that relates to the Ore Reserves for the Mandilla Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 25 June 2025 titled “Mandilla Project Pre-Feasibility Study –
Maiden Ore Reserve". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 25 June 2025 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from
previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
The information in this presentation that relates to the Mineral Resources for the Mandilla Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 21 April 2026 titled "Mineral Resource Increased to 2.07
Million Ounces". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 21 April 2026 and all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from previous market
announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Feysville
The information in this presentation that relates to the Ore Reserves for the Feysville Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 25 June 2025 titled “Mandilla Project Pre-Feasibility Study –
Maiden Ore Reserve". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 25 June 2025 and all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from
previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
The information in this announcement that relates to the Mineral Resources for the Feysville Gold Project reported in this announcement were announced in the Company’s ASX announcement dated 1 November 2024 titled "Astral's Group Gold Mineral
Resource Increases to 1.46Moz with Updated Feysville MRE". The Company confirms that it is not aware of any new information or data that materially affects the information included in the ASX announcement dated 1 November 2024 and all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms the form and context in which Competent Persons’ findings are presented
have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s website at www.astralresources.com.au.
Spargoville
The information in this announcement that relates to the Mineral Resources for the Spargoville Project reported in this announcement were announced in the Company’s ASX announcements dated 7 May 2025 titled "Astral's Group Gold Mineral Resource
Increases to 1.76Moz with the inclusion of Spargoville Gold Project“ and 9 October 2026 titled “Substantial Increase in Mineral Resources at Spargoville”. The Company confirms that it is not aware of any new information or data that materially affects the
information included in the ASX announcements dated 7 May 2025 and 9 October 2026 and all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms the form and context in which Competent Persons’ findings are presented have not materially changed from previous market announcements. The reports are available to view on the ASX website and on the Company’s
website at www.astralresources.com.au.
Pre-Feasibility Study
The information in this presentation that relates to the production target for the Mandilla Gold Project was reported by Astral in accordance with ASX Listing Rules and the JORC Code (2012 edition) in the announcement “Mandilla Project Pre-Feasibility
Study – Maiden Ore Reserve" released to the ASX on 25 June 2025. A copy of that announcement is available at www.asx.com.au. Astral confirms it is not aware of any new information or data that materially affects the information included in that market
announcement and that all material assumptions and technical parameters underpinning the production target, and the related forecast financial information derived from the production target in that market announcement continue to apply and have not
materially changed. Astral confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from that market announcement.
astralresources.com.au ASX:AAR | 4
Important Information and Disclaimer
Previously Reported Results
Exploration Results
The information in this presentation that relates to Exploration Results is extracted from the ASX Announcements (Original Announcements), which have been previously announced on the Company’s ASX Announcements Platform and the Company’s
website at www.astralresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Original Announcements and that all material assumptions and technical parameters
underpinning the estimates in the Original Announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been materially modified
from the original announcement.
ASX:AAR |
astralresources.com.au 5
Astral Resources Investment Highlights
Tier-1 location in the
WA Goldfields
2.2Moz Mineral
Resource and
growing
+95kozpa
production profile
(first 12 years)
Robust
economics and
rapid payback
Strong balance sheet
(~A$65m*)
Clear pathway to
DFS
Multiple near-
term catalysts
Developing a new circa 100kozpa long-life gold project near Kalgoorlie
Significant discount
to our peers
As at 30-Jun-26
astralresources.com.au ASX:AAR | 6
A significant long-life, high-margin
gold development in Australia
The Mandilla Gold Project is…
A large and growing gold system in
the WA Goldfields
Conventional open pit mining and
processing with strong metallurgy
Demonstrating significant exploration
upside across the tenement portfolio
Located in a Tier-1 jurisdiction, with
low sovereign risk and adjacent to
established infrastructure
astralresources.com.au ASX:AAR | 7
Corporate Overview
Options / Rights
16.3M/13.4M
(Ave exercise price 9c)
Cash on Hand
A$65.1M
(Jun Qtr 2026)
Significant Shareholders
Research Coverage
Institutional 23.1%
Non-Institutional 73.0%
Board & Management 3.9%
Shares On Issue
1,809M
Market Capitalisation
A$307.5M
Enterprise Value
A$242.4M
Company Snapshot
Share Price
A$0.17
Share Price Performance
astralresources.com.au ASX:AAR |
$399
$301
$269
$256
$192
$140
$127 $126 $124
$109 $106 $105
$84 $83
-
$50
$100
$150
$200
$250
$300
$350
$400
$450
RXL MM8 MI6 AUC PC2 BTR BM1 GG8 SMI AAR AZY SGC HRN STN
8
Corporate Overview
Options / Rights
16.3M/13.4M
(Ave exercise price 9c)
Cash on Hand
A$65.1M
(Jun Qtr 2026)
Significant Shareholders
Research Coverage
Institutional 23.1%
Non-Institutional 73.0%
Board & Management 3.9%
Shares On Issue
1,809M
Market Capitalisation
A$307.5M
Enterprise Value
A$242.4M
Company Snapshot
Share Price
A$0.17
Peer Comparison: Enterprise Value per Resource Ounce (A$/oz)1
1 – Refer to Appendix 3 for source information.
Average: $173/oz
astralresources.com.au ASX:AAR | 9
9
Corporate & Technical Capability
Management Team
Board of Directors
Justin Osborne
Non-Executive Director
Mr Osborne has over 30
years experience as an
exploration geologist. He
was previously an Executive
Director at Gold Road
Resources (ASX: GOR) and
was pivotal to the resource
development of the world
class Gruyere Gold Deposit
(6.6Moz Au).
Peter Stern
Non-Executive Director
Is a graduate of Monash
University with a Bachelor of
Science (geology major). Mr
Stern’s career has been in
corporate advisory,
spending six years with
Macquarie Bank and three
years with both UBS and
Deutsche Bank.
David Varcoe
Non-Executive Director
David Varcoe is a mining
engineer has more than 30
years experience in the
industry. He has extensive
operational and managerial
experience across a number
of commodities including
gold, iron ore, copper,
diamonds, coal, uranium
and rare earths.
Mark Connelly
Non-Executive Chairman
Mark is a Corporate
Executive with a track
record for deal making and
was principally responsible
for the merger of Papillon
Resources and B2 Gold
Corp in October 2014, as
well for Adamus Resources
Limited and Endeavour
Mining Merger in September
2011.
Marc Ducler
Managing Director
Marc Ducler has over 20
years’ experience in the
mining industry. He was
previously the Managing
Director of Egan Street
Resources (ASX:EGA) until
its successful takeover by
Silver Lake Resources
(ASX:SLR).
Brendon Morton
Chief Financial Officer
& Company Secretary
Brendon has over 20 years
experience including a
significant amount of
experience in the global
resources sector, including
Australia, Africa and Asia.
Brendon has held a number of
executive financial and
company secretarial roles with
both ASX listed and unlisted
companies operating in the
resources sector.
Jed Whitford
Chief Operating Officer
Jed has over 25 years
experience in the mining
industry. In his most recent
assignment Jed held a senior
role with Glencore Nickel's
global management team, he
has previously held roles with
EganStreet Resources, Xstrata,
Minara Resources, Golder
Associates and Gold Fields
amongst others.
Julie Reid
Geology Manager
Julie has 36 years experience
working throughout Australia,
Vietnam and Indonesia
covering a range of
commodities within diversified
geological terrain. Julie holds a
Batchelor of Applied Science
from Curtin University of
Technology.
Mat Wilson
General Manager -
Mandilla
Mathew is a mining engineer
with over 20 years’ experience
in the mining industry. He has
worked in strategic, project
development and operational
management roles across a
diverse range of jurisdictions
including Australia, Africa, New
Caledonia, South America and
Canada. Notably, Mathew was
the Mine Manager during the
development and successful
startup of the fully autonomous
Cote Gold Mine in Ontario.
Richard Jones
Exploration Manager
Richard has over 14 years'
experience as an exploration
geologist, working in gold,
nickel and lithium. Prior to
joining Astral Resources,
Richard held a senior position
in the exploration team at Egan
Street Resources. Richard is
currently the Exploration
Manager for Astral’s Mandilla,
Feysville and Spargoville
Projects.
ASX:AAR |
astralresources.com.au 10
Mandilla PFS Highlights – Compelling Project Economics
+95kozpa
production
profile
1.1g/t average for
12yrs
Further 6.5 years of
LG stockpiles at
42kozpa
Long
mine life
13.2 yrs mining,
18.5 yrs
processing
Profitable,
high-margin
(at A$4,250/oz Au)
AISC
A$ 2,085/oz
over LOM
Funding
quantum
in reach
2.75Mtpa plant
and NPI
A$180.4M
Pre-production
A$46.7M
Robust
Financials
(post Capex/Pre-tax
at A$4,250/oz Au)
NPV8 $1.4B
FCF $2.8B
Payback
12 months
Simple and
conventional
Conventional D&B, load
& haul open pit
Strip ratio of 5.5x*
Simple processing
Excellent metallurgy
95.5% recovery
* Theia only strip ratio. Strip ratio over the LoM is 6.4x when including the remaining Mandilla and Feysville deposits
2 - Refer to Appendix 1 for detailed PFS financial information and to ASX Announcement dated 25 June 2025.
Project
Economics at
Spot Au Price
($6,000)
$2.7B2
NPV8
(pre-tax)
$5.2B
FCF
+95kozpa
Production profile
6 months
Payback
A$ 2,140/oz
AISC over LOM
astralresources.com.au ASX:AAR | 11
• GR Engineering working on the DFS and Target Cost
model
• Capital and operating costs have been received
• ITE underway (initial scope limited to the April 2026
MRE)
• Detailed mine designs, schedules and mine costing
underway
• LUA executed with the Marlinyu Ghoorlie Native Title
Claim Group over the Mandilla and Spargoville Gold
Project areas
• Mining tenement application lodged for remainder of
Mandilla Gold Project (Eos Deposit)
• Site layouts finalised, NVCP, MDCP and Works
Approval to be submitted December Quarter
Mandilla Definitive Feasibility Study
astralresources.com.au ASX:AAR | 12
• Diamond drilling program has been
underway since March 2026
• 18 holes completed to date
• Original program 6-hole (3,000m)
expanded to 21-hole (11,000)
• All completed holes have logged
significant quartz-sulphide vein
percentages and visible gold* –
indicative of a potential significant
extension to the Theia mineralisation
at depth
Theia – The key deposit –remains open at depth
* Cautionary Statement: All references to 'visible gold' in this announcement are references to occurrences of visible gold in core samples from drill holes
for which chemical assay results have previously been released to the market.
ASX:AAR |
astralresources.com.au 13
• AMRCD263 returned significant gold mineralisation
600m downhole
• AMRCD259 returned significant gold mineralisation
735m downhole
• Drilling has demonstrated significant gold
mineralisation and a potential extension of Theia up to
350 metres below the base of April 2026 MRE shell
Theia Deeps Drilling Progress
AMRCD163: 127.3m
@ 1.2g/t Au from 352m
AMRCD163: 15.7m @
3.4g/t Au from 320.4m
AMRCD163: 81.5m @
1.35g/t Au from 515m
ASX:AAR |
astralresources.com.au 14
• This section is located further 100m south of the
previous section
• AMRCD378 returned significant gold mineralisation
53m at 4.67g/t Au starting below the base of the
Resource shell
• AMRCD377 also returned significant gold
mineralisation – 23m at 2.39g/t Au and 33m at
5.02g/t Au – both of which are located below the
base of the Resource shell
• The early interpretation of these higher-grade
zones into coherent shapes could support
extraction by underground mining methods once
below the economic base of the Theia open pit
Theia Deeps Drilling Progress
(continued)
ASX:AAR |
astralresources.com.au
• 99 holes (11,121m) in-fill
completed at Stage 1 (average
1.93g/t Au)
• 431 holes (44,400m) in-fill in
progress at Stage 1 (average
1.39g/t Au for the first 144 holes
for 14,533m)
• 43 holes (4,324m) in-fill
completed at Stage 2 (average
1.22g/t Au)
• On completion, entirety of Stage 1
will be in the higher confidence
Measured Resource category
Theia de-risking – drilling to achieve the higher confidence Measured
Resource category
astralresources.com.au ASX:AAR | 16
• Feysville Project located 14km south of Kalgoorlie –
emerging high-grade satellite operation
• Feeding into central production and processing hub
located at Mandilla - comprises multiple deposits –
Think Big, Kamperman, Rogan Josh
• Mining tenement over Rogan Josh and Think Big
recently granted, Mining tenement over Kamperman
expected to go to grant in December Quarter
• Heritage survey recently completed at Kamperman,
preliminary clearance approval received, drilling to
recommence in the December Quarter
• Kamperman is an exciting high-grade discovery –
Resource update underway
• Think Big – early cash-flow opportunity through
mining JV
Feysville – Satellite Opportunity
astralresources.com.au ASX:AAR | 17
• LOI executed to mine ~ 32,000oz
from Think Big as an early revenue
opportunity to fund development of
the Mandilla Gold Project
• Native Title Agreement executed
with Marlinyu Ghoorlie
• Mining Tenement M 26/846 recently
granted
• NVCP approved and MDCP
currently under assessment by the
regulator
Think Big has the potential to
contribute significant free cash-flow
to support the Mandilla Gold Project
funding requirements
Feysville – Think Big Monetisation
astralresources.com.au ASX:AAR | 18
• 6,000m of RC drilling completed to in-fill Think
Big ahead of mining
• Best results include:
• 11m at 7.34g/t Au
• 12m at 5.89g/t Au
• 3m at 10.0g/t Au, 2m at 9.53g/t Au and
9m at 6.01g/t Au
• 2m at 8.01g/t Au, 12m at 2.99g/t Au and
12m at 4.14g/t Au
• 11m at 3.97g/t Au
• 2m at 3.54g/t Au and 16m at 2.33g/t Au
• 4m at 8.27g/t Au
Feysville – Think Big Monetisation
astralresources.com.au ASX:AAR | 19
Spargoville – Significant Exploration Upside
~14km of highly prospective strike between the
Wattle Dam and Eagle Complex with very little deep
drilling outside of known Resource areas
• Two high-priority areas identified for immediate
follow-up
• Resource update recently completed – 8.5Mt at
1.0g/t Au for 281koz of contained gold – 102%
increase from only 16,000m of new drilling
• Heritage clearance survey recently completed,
preliminary clearance approval received, drilling at
Wattle Dam to commence in the December Quarter
• Both areas are essentially untested below 100m drill
depth despite favorable geological conditions, gold-
in-soil anomalism and proximity to known deposits
Wattle Dam
Eagle Complex
Holes > 100m
depth assayed
for gold across
Spargoville
tenements
20
Key Catalysts
Theia in-fill and Theia Deeps diamond drilling
Mandilla MRE update
DFS completion
Think Big mine production
Kamperman and Spargoville exploration
Kamperman MRE update
ASX:AAR |
astralresources.com.au ASX:AAR |
astralresources.com.au 21
Investment Summary
Emerging WA gold
developer
Robust long-life
project economics
Significant resource
growth potential
Strong balance
sheet
Clear pathway
to DFS
A S X : AA R
astralresources.com.au
Suite 2, 6 Lyall St, South Perth, WA, 6151
T: +61 8 9382 8822
E: info@astralresources.com.au
Contact Us
* Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analysis where concentrations or grades are the factor of principal economic interest. Visual
estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations. See Appendix 4 for logging of holes for which chemical assay results have not yet been reported.
ASX:AAR |
astralresources.com.au 23
(1,200)
(900)
(600)
(300)
-
300
600
900
1,200
1,500
1,800
2,100
2,400
(300)
(200)
(100)
-
100
200
300
400
500
600
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Cum Cash Flow(RHS) Net Revenue Opex
Corporate, Exploration, Feasibility Change in Working Capital Capex
Sustaining Capex Annual Cash Flow
Key Financial Assumptions
Gold Price Assumed A$/oz 4,250
Discount Rate % 8
Foreign Exchange AUD:USD 0.65
Key Project Metrics
Payable Metal Koz 1,414
Gold Revenue A$M 6,011
Mining Costs – Total A$M 1,594
Mining Costs – Pre-Production (capitalised) A$M -40
Mining Costs A$M 1,553
Processing (including Maintenance, Transport, Insurance & Refining) A$M 963
General and Administrative Costs A$M 166
Royalties A$M 187
Project EBITDA A$M 3,142
Depreciation and Amortisation A$M 307
Net Profit Before Tax A$M 2,835
Capital
Pre-Production Capital Expenditure (incl. contingency) A$M 180
Pre-Production Costs - Mining/General & Administrative A$M 47
Sustaining Capital A$M 80
LOM Capital A$M 307
Project Returns
FCFF (Pre-tax) A$M 2,835
FCFF (Post-tax) A$M 2,012
Pre Tax NPV @ FID (8.0%) AUD M 1,400
Pre Tax IRR (at FID) % 101%
Pre Tax payback - From first Au production Years 0.92
Post Tax NPV @ FID (8.0%) AUD M 1,001
Post Tax IRR (at FID) % 86%
Post Tax payback - From first Au production Years 1.00
Equity NPV @ FID (8.0%) AUD M 1,001
Post Tax IRR (at FID) % 86%
Capital Intensity (Steady State) AUD/oz p.a. 2,381
Pre-Tax NPV/Pre-Production Capital x 6.16
Post-Tax NPV/Pre-Production Capital x 4.41
Appendix 1 - PFS Financials
Stage 1 Cash Flow
Operating Costs1 $ million $/t Milled $/oz
Mining2 $1,553 $30.81 $1,098
Processing (incl. Maintenance, Transport, Insurance & Refining) $963 $18.95 $681
General & Administrative (Site) $166 $3.28 $118
C1 Cash Cost3 $2,682 $52.80 $1,897
Royalties $187 $3.69 $132
Sustaining Capital $80 $1.57 $56
All-in Sustaining Cost (AISC)4 $2,949 $58.05 $2,085
LoM of Mining Costs:
$4.25 per tonne
$12.48 per BCM
ASX:AAR |
astralresources.com.au 24
Appendix 2 – Mineral Resources & Ore Reserves
Project
Probable Total Ore Reserve
Tonnes Grade Metal Tonnes Grade Metal
(Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au)
Mandilla 34.3 0.9 1,000,000 34.3 0.9 1,000,000
Feysville 2.3 1.2 88,000 2.3 1.2 88,000
Total 36.6 0.9 1,082,000 36.6 0.9 1,082,000
Ore Reserves are a subset of Mineral Resources.
Ore Reserves are estimated using a gold price of AUD $3,000 per ounce.
The preceding statement of Ore Reserves conforms to the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor
discrepancies may occur due to rounding to appropriate significant figures.
The Ore Reserves for Mandilla are reported at a cut-off grade of 0.30 g/t Au lower cut-off and Feysville are reported at a
cut-off grade of 0.40 g/t Au lower cut-off.
Group Ore Reserve Estimate
Group Mineral Resource Estimate
Project
Measured Indicated Inferred Total Mineral Resource
Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal
(Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au) (Mt) (Au g/t) (oz Au)
Mandilla 1.3 1.3 57,000 32.6 1.0 1,092,000 19.6 0.9 588,000 53.5 1.0 1,736,000
Feysville - - - 3.5 1.3 144,000 1.5 1.1 53,000 5.0 1.2 196,000
Spargoville - - - 5.1 1.1 186,000 3.4 0.9 95,000 8.5 1.0 281,000
Total 1.3 1.3 57,000 41.2 1.1 1,422,000 24.5 0.9 735,000 67.0 1.0 2,214,000
The preceding statement of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code) 2012 Edition. All tonnages reported are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate
significant figures
The Mineral Resources are reported at a 0.40 g/t Au lower cut-off for Mandilla, Spiders, Eagles Nest, 8500N and 5B, and a 0.39g/t Au lower cut-off
grade for Feys
Share your feedback
Discover