Quarterly Activities & Cashflow Report
Released
Released
Announcement PDF
Quarterly Report
for the three months ended 31 March 2015
Summary & Highlights
Anglo Australian Resources NL
ASX Code: AAR
ACN: 009 159 077
Ground Floor
63 Hay Street
Subiaco WA 6008
Tel:
08 9382 8822
Email: info@anglo.com.au
www.anglo.com.au
Capital Structure
135,075,087 ordinary shares
24,800,000 options ($0.02, exp. 30/11/19)
3,565,004 options ($0.08, exp. 30/06/15)
1,000,000 options ($0.12, exp. 30/11/15)
2,600,000 options ($0.15, exp. 30/11/15)
EXPLORATION
•
Koongie Park Gold– Five gold targets defined for
follow-up exploration
•
Koongie Park Base Metals – A detailed review of all
known geochem data identifies base metal targets
along strike from the Sandiego – Onedin resource
projects
CORPORATE
•
$215,000 share placement during the quarter
•
Change of share registry
Details
Board Members
John Jones
Executive Chairman
Peter Stern
Non-Executive Director
Graeme Smith
Director / Company Secretary
EXPLORATION
Koongie Park Gold Project – WA
Anglo Australian - 100% interest
Pursuant to the discovery of anomalous gold results
associated with NNE trending parallel quartz veins at
Nicolson’s Find East on Anglo Australian’s E80/4389
(Quarterly Report June 2014), Anglo Australian
commenced evaluation of the gold prospectivity
within the Koongie Park project area.
The March 2015 announcement by Pacific Niugini Ltd
that it expected to commence production at its 86,300
ounce Nicolsons Mine (435,400 tonnes @ 6.17 g/t) by
the third quarter of 2015 has further highlighted the
potential in the district for high grade gold
mineralization over narrow widths. The Nicolsons
Mine gold project is located about 5 kilometres west
of Anglo Australian’s tenements.
ANGLO AUSTRALIAN RESOURCES NL
March 2015 Quarterly Report
Anglo Australian is continuing its review of results from work carried out previously for gold by
various exploration companies. The review has centred on exploration licences E80/4389, E80/4503
and E80/4257 which cover stratigraphy to the southwest, along strike, from the Sandiego base metal
deposit. As well as digital data recently released by the Department of Mines and Petroleum, WA,
hard copy data from earlier reports is also being evaluated. The only exploration license to have any
significant historical gold work was E80/4389; however there has been only minimal drilling and
several targets that were delineated appear to have been never drill tested.
So far, Anglo Australian has identified a number of regional structural corridors on its property for
follow-up work. Of immediate interest is the NE striking Highway shear zone which extends for
about 15 kilometres along the contact of the Koongie Park Formation and the southwest edge of
the Lodestone Monzogranite within Anglo Australian’s tenements. This area has received minimal
historical gold exploration and can easily be evaluated with surface sampling or shallow drilling.
Koongie Park gold targets
Five priority targets (HW1-HW4 and Black Rock South) have been defined where NNE trending splay
shears come off the main regional shear. The NNE orientation of the splay shears is the preferred
orientation for structurally controlled mineralisation in the area and their junction with the main
shear could provide dilational zones for mineralisation. The next program of field work will include
soil, rock chip and auger sampling over these conceptual target areas to generate anomalies for drill
testing.
In addition, the Crazy Cat prospect discovered by Navigator Resources/ Magma Metals lies 6
kilometres ENE of Nicolson’s Find in Anglo Australian’s E80/438,. Rock chip sampling of this area
2
ANGLO AUSTRALIAN RESOURCES NL
March 2015 Quarterly Report
highlighted a series of gossanous quartz stockwork veins and vein sets which recorded values
ranging from 0.13 – 11.1 g/t gold over a 120 metre strike length. The quartz vein is hosted by deeply
weathered Monzogranite which is poorly exposed in part. The zone trends in a NW orientation and
is interpreted to represent a link fault between the Springvale/Nicolson’s Find and the Paddock
Well/Shifty Faults. There is no reported drilling in the area.
The gold potential associated with the Onedin and Sandiego base metal deposits was also
investigated. Exploration companies prior to 1983 did not analyze any drill or soil samples for gold.
Although the current identified mineral resources for the Onedin and Sandiego deposits indicate
gold grades of less than 0.5 g/t Au for the minerals, there is some potential for high grade
mineralisation in discreet portions of the depoits. Selective re-sampling of existing core and post
1983 drilling from Onedin and Sandiego base metal deposits returned a number of significant
intersections: ORDC01: 21 metres @ 3.1 g/t from 46 metres, SRCD10: 4 metres @ 9.94 g/t from 18
metres, SRDC29A: 5 metres @ 21.65 g/t gold from 119 metres. Also it is uncertain at this stage
whether the up-dip supergene gold potential was tested and this situation will be investigated
further.
Koongie Park Base Metals Project – WA
Anglo Australian - 100% interest
Review of all geochem data including ant nest results indicates anomalous geochem anomalies
extend along strike from the Sandiego and Onedin base metal deposits. Portions of these areas
require further testing and some parts have not previously been drilled.
Discussions with external parties in relation to base metal targets is ongoing.
Feysville – WA
Anglo Australian - 100 % interest
Anglo Australian has reassessed the ten prospecting licences at Feysville, WA during the quarter in
view of the current Australian gold price. The tenements contain the Rogan Josh gold mineralisation
drilled on a 20 metre by 40 metre spacing. Due to lack of definitive specific gravity data, limited
QAQC data, no RC –DDH twinning, and lack of gold size analysis, a mineral resource cannot be
estimated. However, from the data available there is indication that a target size within the range
of 250,000 tonnes to 350,000 tonnes grading 1.5 to 2.2 g/t Au is available on the property.
BM Geological Services (BMGS), which carried out preliminary resource investigations for Rogan
Josh in May 2010 and March 2011, recommended a portion of the mineralisation be drilled down
to grade control spacing of 10 metre by 10 metre (over 50 metre by 50 metre section of high grade
material) to give a better understanding of mineralisation continuity.
Areas requiring further work toward a resource estimation included:
1. Specific gravity carefully determined with respect to geology and mineralisation, and
systematic SG sampling program implemented to ensure valid data is being used.
2. Any future work at Rogan Josh should use systematic QAQC to ensure data is of good quality.
It is recommended that the following be implemented:
•
Insert internal standards and blanks to monitor assay grades
•
Complete coarse gold test work
•
Complete recovery test work
•
Twin RC holes with Diamond drilling to confirm mineralisation
3
ANGLO AUSTRALIAN RESOURCES NL
March 2015 Quarterly Report
Furthermore, BMGS recommended that optimization studies be completed on the economic
potential of the mineralisation to ensure any further work that may be completed is based on a
realizable economic return.
Anglo Australian is considering these recommendations in light of further work to define a resource
on the property.
Mandilla Project – WA
Anglo Australian - 100% interest
A desktop study undertaken on ELA15/1404 and a greenfield conceptual target defined from this
work. There is abundant evidence in the detailed magnetics over Mandilla to suggest that the
interpreted NE intersecting structure that hosts the Palaeo Channel gold as discovered in
historical exploration is realistic target. Detailed magnetic data is not available for ELA15/1404 and
the magnetics in this area are subdued perhaps to the lack of detail and the area being
predominately underlain by Black Flag beds. Of note are numerous syntectonic granite intrusives
within the Black Flag beds on the Lake Lefroy 100K sheet to the south. Detailed magnetic data could
reveal the presence of similar intrusive in ELA15/1404.
It is anticipated that an exploration licence will be granted in June 2015. Subsequent to grant, it is
intended to test the zone with Rotary Air Blast or Reverse Circulation drilling.
Mandilla projected target extension
4
ANGLO AUSTRALIAN RESOURCES NL
March 2015 Quarterly Report
Leonora Project – WA
Anglo Australian - 100% interest
No work was carried out during the quarter. Options for progressing exploration of the VMS base
metal potential of the project area including the search for an incoming party are being considered.
CORPORATE
Change of Share Registry
During the quarter, the Company’s share registry function was transferred to Security Transfer
Registrars.
Share Placement
$215,000 was raised from a 21.5 million share placement to sophisticated investors during the
quarter.
For further information:
John L C Jones – Chairman
Telephone: (08) 9322 1788
Compliance Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on
information compiled by David Otterman, who is an independent consultant from DW Otterman Exploration
Consultant.
Mr Otterman is a Fellow of The Australasian Institute of Mining and Metallurgy (CP) and a Member of the
Australian Institute of Geoscientists (RP Geo).
Mr Otterman has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Otterman consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Mr Otterman has disclosed to the reporting company the full nature of the relationship between himself and
the company, including any issue that could be perceived by investors as a conflict of interest. He verifies that
the Report is based on and fairly and accurately reflects in the form and context in which it appears, the
information in supporting documentation relating to Exploration Targets and Exploration Results.
5
ANGLO AUSTRALIAN RESOURCES NL
March 2015 Quarterly Report
SCHEDULE OF MINING TENEMENTS
Project
Tenement
Company Interest
Title Registered to
Western Australia
Koongie Park
M80/276, 277
E80/4257, 4389,4766
EL80/4503
P80/1599-1611
P80/1802-10
100%
Anglo Australian Resources NL
100%
Anglo Australian Resources NL
100%
Anglo Australian Resources NL
Feysville
P26/3942 - 3951
West Musgrave
E69/3197
Mandilla
M15/96
100% gold rights only
M15/633
100% gold rights only
ELA15/1404
100%
Leonora
E37/1047, E37/1056,
E37/1114 – 1115,
P37/8355 – 8358,
P37/8377
100%
Anglo Australian Resources NL
Anglo Australian Resources NL
Northern Territory
Victoria River
Downs
EL25728
EL27934
EL 28753
Anglo Australian Resources NL
100%
6
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
Anglo Australian Resources NL
ACN
Quarter ended (“current quarter”)
009 159 077
31 March 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
1.4
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (provide details if material)
1.5
1.6
1.7
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b)equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c)other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 1
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
(171)
(29)
-
(325)
(175)
-
-
-
(200)
(500)
-
-
-
-
(200)
(500)
Appendix 5B
Mining exploration entity quarterly report
1.13
Total operating and investing cash flows
(brought forward)
(200)
(500)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other – Bond refund
215
11
(25)
-
215
121
(25)
136
Net financing cash flows
201
447
Net increase (decrease) in cash held
1
(53)
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
1
-
55
-
1.22
Cash at end of quarter
2
2
1.14
1.15
1.16
1.17
1.18
1.19
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the related
entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
-
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
100
Amount used
$A’000
100
Nil
Nil
Estimated cash outflows for next quarter
$A’000
40
4.1
Exploration and evaluation
4.2
Development
-
4.3
Production
-
4.4
Administration
10
Total
50
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
1
2
5.2
Deposits at call
-
-
5.3
Bank overdraft
-
-
5.4
Other (provide details)
-
-
Total: cash at end of quarter (item 1.22)
1
2
Changes in interests in mining tenements
Tenement
reference
6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 3
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Appendix 5B
Mining exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
7.6
7.7
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs
+Convertible debt
securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through securities
matured, converted
Options
(description and
conversion factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
Expired during
quarter
Debentures
(totals only)
Unsecured notes
(totals only)
7.10
7.11
7.12
Number
quoted
Issue price per
security (see
note 3) (cents)
Amount paid up
per security (see
note 3) (cents)
135,075,087
135,075,088
21,500,000
21,500,000
3,565,004
1,000,000
2,600,000
24,800,000
-
Exercise price
8 cents
12 cents
15 cents
2 cents
Expiry date
30 June 2015
30 November 2015
30 November 2015
30 November 2019
2,561,027
-
9 cents
31 March 2015
+ See chapter 19 for defined terms.
Appendix 5B Page 4
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
Print name:
(Company secretary)
Date: 30 April 2015
Graeme Smith
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and
there are conditions precedent which will change its percentage interest in a
mining tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B Page 5
Share your feedback
Discover